Crusher's operation and maintainance


First, the preparatory work before starting
1, double-check whether the lubrication of bearings is good and whether there is sufficient lubrication oil on elbow junction board.
2, double-check whether all fasteners are fully tightened.
3, carefully check if the drive belt is good, if found having broken phenomenon, it should be replaced. When found oil slick on the belt or pulley, it should be wiped by rag
4, check whether has ore or debris in crushing cavity. If have ore or debris. It must be cleaned to ensure no-load starting crusher.
5, check whether the top bolts return, gaskets are pressed, T-bolts are tightened.
Second, starting
1, check the normal conditions of the various parts of the machine before starting.
2, this machine is only allowed in case of starting without load.
3, start with a bell or a signal as the prior notice.
4, after starting, when irregularities are found, it should immediately stop. Identified and ruled out non-regular case before starting the normal situation
Third, the use
1, make sure the normal revolve before feeding
2, broken material should be uniform to join the broken cavity. Should avoid adding or filled with lateral feeding, so as not to overload caused by nesting uneven and unnecessary mechanical damage.
3, in normal operating conditions, bearing temperature should not exceed 30 degrees, the maximum temperature not exceeding 70 degrees. Over the temperature, should stop immediately, identifying reasons and to discharge only after the starter motor.
4 we should first stop feeding before parking, broken material in cavity should be discharged completely before the motor shut down.
5, while crushing, the machine is stopped by the clog of material in crushing cavity. you should immediately stop.re-start after discharging all material
6, one end of the fixed jaw plate or activities wear, may turn around to use.
7, after use for some time of broken machine, elbow sleeve adapter should be re-tightened to prevent the adapter sleeve loose in elbow injury against the machine produces.
4, lubrication
1, constant and timely attention of the work of lubrication, to ensure the normal operation of the machine and extend the life of the equipment.
2, grease that our machine uses should be determined by the location and the conditions the, in general, normally we use calcium-based, sodium and calcium Nazi grease.
3, adding grease should be about 50% for the room within the bearing capacity, every 3 to 6 months to replace the first, when change oil? you should apply of clean gasoline or kerosene cleaning raceway of roller bearing.
4, Right amount of grease should be injected into between bracket the bracket the before starting machine
(Hope customers in use follow the above principles)


complete sets of production lines
¡¤Cement Production Line
¡¤Stone production line
¡¤Sand production line
¡¤Mine selection line
¡¤Aerated Concrete Equipment
¡¤Active lime production line
Crushing equipment
¡¤jaw crusher ¡¤Impact crusher
¡¤Cone crusher ¡¤Hammer crusher
¡¤compound crusher
¡¤roll crushing mill
¡¤High-efficient fine impact crusher
¡¤V fine crushe
¡¤Mobile crushing plant
¡¤stone crusher ¡¤Box crusher
¡¤Reversible crushe
¡¤Double toothed roller crnsher
Stone production equipment
¡¤jaw crusher ¡¤Impact crusher
¡¤Impact crusher ¡¤Cone crusher
¡¤Vibrating feeder
¡¤Circle vibrating screen
¡¤Bucket-wheel sand washing machine
¡¤Band conveyor
Mine selection equipment
¡¤Energy-saving ball mill
¡¤Chinaware ball mill
¡¤Magnetic separator
¡¤flotation machine
¡¤Jaw crusher ¡¤ V crushe
¡¤Raymond mill ¡¤Rotary dryer

stone production line|Sand production line|Mine selection line |jaw crusher|Impact crusher|Sand making machine|Fine Crusher|vibrating screen|ball mill |rotary kiln |dryer

 
Gravel phones£º86-371-68592888     Mineral phones£º86-371-61993111
  Fax£º86-371-86001808 Aftermarket phones£º86-371-63713668
Contact Address£ºwest development district of zhengzhou city Postcode£º450007
Yu ICP ±¸ 10006807 ºÅ